How to Structure an ERP Project for a Tight Go‑Live Deadline
ERP implementation takes time. But what if your business needs a system in place fast? This was the situation with contract manufacturer, TriRx Pharmaceutical Services.
TriRx had just three months to roll out an ERP solution from scratch. The company had started with the acquisition of a dormant manufacturing facility in Alabama, and it needed the site operational in a matter of months so it could fulfil its first contract.
“We had to move aggressively fast,” says Scott Harris, who was tasked with getting TriRx up and running as the firm’s vice president and site director at the time. “The first time we showed up to the site was July, and we needed to get the system in before our first production batches in November.”
The company turned to us for help because we have a strong reputation for implementing ERP on time and under budget as an SAP Gold Partner. We got the TriRx system up and running in less than 90 days.
“Navigator did an outstanding job,” notes Harris. “We hit our timeline.”
Read more about TriRx’s ERP implementation journey
The Playbook for a Fast ERP Implementation
Structuring an ERP project for a compressed timeline requires shifting from a traditional, expansive scope to a hyper-focused, ruthless prioritization model. Success relies on speed, decisiveness, and strict governance.
Here’s our playbook for rolling out ERP fast under a tight deadline.
Phase 1: Establish Accelerated Governance and Quick Decision-Making
A fast ERP implementation requires rapid, decisive decision-making. This starts with a simplified governance structure.
Establish a high-level executive steering committee for the project with ultimate authority to make binding decisions within 24 hours to prevent bottlenecks.
Once this is put in place, appoint a single, empowered business lead (product owner) who can speak for all departments and sign off on design choices without escalating back up the bureaucratic chain.
Phase 2: Rapid Discovery and Minimum Viable Product (MVP) Scope
Rolling out an ERP implementation fast requires limiting scope. To achieve speed but not sacrifice functionality, limit the scope to only what is required to run core business operations on Day One. Defer all “nice-to-have” customizations, advanced analytics, non-critical integrations, and useful but not strictly necessary capabilities for later build-out.
Once scope is defined, freeze it immediately so no additional changes can be made.
When mapping processes, further speed up planning and implementation by adopting out-of-the-box standard software processes instead of forcing the ERP to match legacy workflows. Adapt the business to the system, not the system to the business.
While going through discovery and scope definition, also begin cleaning existing data in preparation for eventual import. More on this in Phase 4.
Phase 3: Agile Execution and Parallel Workstreams
There’s a lot to set up, so handle several things at once.
Build out the ERP system along parallel tracks for faster implementation. Run data migration, system configuration, integration development, and user training simultaneously rather than sequentially.
Use an iterative approach for testing so functionality and overall outcomes are verified on a near real-time basis; configuration errors are easy and cheap to fix when they are spotted early. This is done by implementing continuous or sprint-based testing rather than waiting for a massive final User Acceptance Testing (UAT) phase.
Phase 4: Prioritized Data Migration
Data cleaning and migration can significantly slow down an ERP implementation. Prioritize what legacy data must actually go into the system before go-live, and start the data cleaning process on Day One as mentioned above.
The trick is not migrating historical data that is older than necessary. So bring over open balances and active master data, but leave the rest; archive past history instead of migrating it to your new ERP system.
Moving fast does not mean skipping data validation, however. Conduct multiple end-to-end data migration dry runs before you cut over to the new ERP system to ensure that the right data is populated and that it is formatted correctly. Dry runs help ensure that the transition to the new system goes smoothly. This cannot be skipped.
Phase 5: Focused Change Management and Training
ERP implementation does not end with system configuration and data migration; employees also must know how to correctly operate the system.
Expedite employee onboarding and instill better acceptance of the new system by using role-based training. Train users specifically on their daily transactional tasks rather than presenting generic system overviews.
Also prepare for early hiccups and user questions with hypercare support. Plan an intensive post-go-live hypercare period with dedicated on-the-floor or virtual support teams to immediately troubleshoot user friction and stabilize operations where necessary.